Business solar panel installation
Commercial solar panels designed for businesses that want to reduce energy costs and lower their carbon footprint. A smart, sustainable investment that helps you save money while supporting a greener future.

UWE cut energy costs by £63,593 and offset carbon emmissions by 56,938kg yearly
UWE redeveloped their enterprise park and requested an upgrade to their existing solar setup. We installed 586 x 475W panels across two roofs spanning three elevations, using a Bauder mounting system to preserve the roof warranty.
To boost solar capacity by 260kW, we fitted three 60kW and one 80kW Solis inverters. Fire switches were integrated into the building’s fire control system to meet insurance requirements, and all inverters were connected to the internet for remote monitoring.
£1.6M lifetime ROI
Over the system's 25 year lifetime, it will yield over £1.6m in savings for the University of the West of England.
Energy Generation
Over the course of a single year, this system will generate 264,971kWh of green energy.
Save big on rising energy prices
With energy costs projected to rise by 20–30% by 2030, investing in industrial solar panels is a smart way to protect your business and significantly reduce long-term expenses.
Enhancing your energy resilience
The energy crises of 2021 and 2022 exposed just how vulnerable the market can be, Commercial solar panels offer a reliable way to protect your business from ongoing price volatility.
Reducing your carbon footprint
With Net Zero targets placing growing pressure on businesses to cut emissions, solar energy offers an effective and practical way to reduce your carbon footprint.
Case studies
In-Roof Solar & Hybrid Battery System Designed Across Three Roofs
For a new-build home in Worcestershire, we installed a 6.37kW solar PV system using 19 Viridian 335W in-roof panels and a 5kW Puredrive battery, managed by a Solis 5kW hybrid inverter. Installed across three roof elevations in an East/West layout, the system generates 4,533 kWh annually, saving £1,156.92 per year and offsetting 2,125 kg of CO₂. A smart CT clamp setup ensured smooth integration with the property's dual consumer units.
Yearly Energy
4,533kWh
Lifetime Saving
£28,923
Yearly Saving
£1,156.92
C02 offset
2,125kg p/y
Fully Optimised SolarEdge System with Battery Storage in Bromley Heath
This 4.02kW domestic solar PV system in Bromley Heath features 13 Trina Vertex 400W panels, SolarEdge optimisation, and a 9.5kW GivEnergy Gen2 battery. The system is AC-coupled with a standard inverter, allowing for panel-level monitoring and compatibility with Feed-in Tariff setups. It generates an estimated 3,819 kWh annually, saving £974.85 per year and offsetting 890 kg of CO₂.
Yearly Energy
3,819kWh
Lifetime Saving
£24,371
Yearly Saving
£974.85
C02 offset
890kg p/y
On-Roof Solar PV System with Battery Storage
A homeowner in Hinton, near Chippenham, wanted a discreet solar setup as part of a re-roofing project. We installed a Viridian Clearline Fusion in-roof solar array alongside a GivEnergy hybrid inverter and 9.5kWh battery. With limited indoor space, the system was installed externally—finished with a custom-made protective cover for a clean, professional look.
Yearly Energy
3,420kWh
Lifetime Saving
£21,802
Yearly Saving
£872.10
C02 offset
797.86kg p/y
Solar PV installation for a cental london 50 storey tower.
A 50-storey landmark tower in central London, now the UK’s tallest commercial building to achieve BREEAM Outstanding, features a photovoltaic array installed by Comera Energy on the 48th floor, with a bespoke frame to withstand high wind loads and integration with fire safety systems.
Yearly Energy
20,533kWh
Lifetime Saving
£130,923
Yearly Saving
£5,236
C02 offset
4,253kg p/y
Solar PV installation for a leisure centre in Burgess Hill.
The Triangle Leisure Centre in Burgess Hill offers a gym, pool, soft play, party spaces, and sports facilities. Comera Energy designed, supplied and installed a photovoltaic system on its Kingspan trapezoidal roof using a Renusol mounting system, fully integrated with the building’s fire safety systems.
Yearly Energy
216,229kWh
Lifetime Saving
£1,378,460
Yearly Saving
£55,138
C02 offset
44,774kg p/y
Solar PV installation to W & T Blocks at Frenchay Campus, UWE Bristol.
As part of its 2030 development strategy, the University of the West of England is prioritising sustainability, with solar energy playing a key role. Comera Energy designed, supplied and installed a photovoltaic system on the W & T Blocks at Frenchay Campus, integrating it with the building’s fire safety systems.
Yearly Energy
264,971kWh
Lifetime Saving
£1,689,215
Yearly Saving
£67,568
C02 offset
56,938kg p/y
Solar PV installation to Blavatnik School of Government
Comera Energy were engaged to design, supply and install the photovoltaic installation to the new building which would host one of Oxford’s newest departments, the Blavatnik School of Government. The building was designed by Herzog & De Meuron Architects formed in an irregular stack of circular blocks in glass and concrete.
Yearly Energy
29,881kWh
Lifetime Saving
£190,491
Yearly Saving
£7,619
C02 offset
13,700kg p/y
Solar PV installation to Science Creates, Bristol
Comera Energy were engaged to design, supply and install the photovoltaic installation for Science Creates in Bristol. Science Creates is a Bristol based incubator project for high tech businessess.
Yearly Energy
91,667kWh
Lifetime Saving
£584,352
Yearly Saving
£23,374
C02 offset
21,359kg p/y
Solar PV installation to Bromsgrove School Cafeteria catering for 1,400 students per day.
This project is the refurbishment and extension of the existing dining hall at the prestigious Bromsgrove School, providing a state of the art food hall that can cater for 1,400 students a day. The proposals aimed to address the inefficiencies of the building which included the provision of a roof mounted solar array.
Yearly Energy
31,407kWh
Lifetime Saving
£200,194
Yearly Saving
£8,007
C02 offset
7,323kg p/y
Fully Integrated Solar & Battery System at Rownham Close
This 6.15kW domestic system combines 15 JAM54S 410W panels with Fox hybrid battery storage, giving the homeowner energy independence and reduced bills. Producing an estimated 15,682.50 kWh over 25 years, the system includes integrated roof mounting and external AC cabling, all professionally installed with reinforced support and expert roofing work.
Yearly Energy
5,842kWh
Lifetime Saving
£39,206
Yearly Saving
£1,568.25
C02 offset
1,362kg p/y








Our Commercial Solar Process
Our commercial solar panel installations follow a clear, structured process designed to ensure quality, efficiency, and minimal disruption to your business. From the initial consultation through to final commissioning and aftercare, we handle every step with precision and professionalism.
1
Consultation & Bespoke Quotation
Our commercial solar panel installations follow a clear, structured process designed to ensure quality, efficiency, and minimal disruption to your business. From the initial consultation through to final commissioning and aftercare, we handle every step with precision and professionalism.
2
DNO & Grid Application
We manage all aspects of your DNO (Distribution Network Operator) application. This includes submitting the necessary paperwork, liaising directly with your local network provider, and ensuring full compliance with UK grid regulations. This step is vital for safe, legal, and timely grid connection.
3
Structural & Site Survey
Before installing anything, we perform a thorough structural and site analysis. Whether your system is roof-mounted or ground-mounted, we assess load-bearing capabilities and site conditions to ensure everything is suitable. You’ll receive a clear report outlining our findings and any recommendations.
4
Custom System Design
Using insights from the consultation and site survey, our in-house team designs a solar system built around your business’s energy profile. We focus on optimising performance, reliability, and regulatory compliance, ensuring a smooth transition to clean energy.
5
Equipment Procurement
We only source components from trusted, high-performance brands. Comera Energy partners with leading manufacturers such as JA Solar, Solaredge, FoxESS, and Pylontech, ensuring every installation uses reliable, efficient, and future-proof technology.
6
Project Management
A dedicated project manager oversees every stage, from scheduling and procurement to contractor coordination and compliance checks. You’ll have a single point of contact and regular updates, so your project runs on time and with minimal disruption to your business.
7
Expert Installation
Our skilled installation teams carry out the work with precision and care, whether it’s rooftop panels, ground-mounted arrays, or integrated battery systems. All installations follow the latest UK safety and quality standards, with minimal disruption to your day-to-day operations.
8
Commissioning & Handover
Once installed, your system is fully tested, inspected, and fine-tuned to ensure it operates exactly as designed. We provide a comprehensive handover pack—including system guides, warranties, performance data, and maintenance tips, so you’re fully equipped from day one.
9
Performance Monitoring
We set up intelligent monitoring tools that allow you to track energy production and usage in real time. With this insight, you can verify savings, spot issues early, and even explore options like battery storage to enhance your energy independence.
10
Ongoing Maintenance & Support
Depending on your chosen financial model, such as a Power Purchase Agreement (PPA), ongoing maintenance may be included. Either way, we offer full-service support, including annual inspections, system optimisation, and technical checks to keep everything running smoothly.







Get a personalised business solar quote
Enter your details and a commercial solar expert will be in touch to explore your potential savings and provide a free, no-obligation quote.