University of West of England

Project Profile

Project name: W & T Blocks, Frenchay Campus

Location: Bristol, UK

Client: RPC Electrical Contractors

Solar PV installation to W & T Blocks at Frenchay Campus, UWE Bristol.

The University of West of England has an ongoing development plan as part of its 2030 strategy. Instrumental in this programme of work is future sustainability with solar energy being a key component.

Comera Energy were engaged to design, supply and install the photovoltaic installation to W & T Blocks at Frenchay Campus.

The array was integrated with the building fire safety systems.

System Size: 260Kw comprising 586 Jinko 475w panels. Annual output 264,971 Kwh with an annual CO2 saving of 56,938 kg.

Annual energy generation

264,971

kWh

Lifetime energy savings

£1,689,215

British Pounds Sterling (£)

Savings per year

£67,568

British Pounds Sterling (£)

Savings per month

£5,630

British Pounds Sterling (£)

Carbon offset per year

56,938

kg of carbon offset

Get a personalised business solar quote

Enter your details and a commercial solar expert will be in touch to explore your potential savings and provide a free, no-obligation quote.

Name(Required)
Address(Required)
This field is for validation purposes and should be left unchanged.